| Name of the Project | State | Type Of Contract |
| Balance works of 4-laning of Rampur-Kathgodam section of NH-87 (New NH No. 09) from Km 0.000 (Km 190.000 of NH-24) to Km 42.791 (design Chainage Km 43.446) (Package-I) in the state of Uttar Pradesh on EPC Mode | Uttar Pradesh | EPC |
| Improvement and Up-gradation of Existing Road to 4–lane with Paved Shoulder from Km 88.750 to 123.650, Start of Shahjahanpur bypass to Start of Shahabad Bypass of NH-731 on Hybrid Annuity Mode in the state of Uttar Pradesh | Uttar Pradesh | HAM |
| Improvement and Up-gradation of Existing road to 4– lane with Paved Shoulder from km 123.650 to 175.080, start of Shahabad Bypass to end of Hardoi Bypass of nh-731 on ham basis in the state of Uttar Pradesh |
Uttar Pradesh | HAM |
| Construction of 6-Lane Durg – Raipur – Arang Bypass section of NH-53 from design ch.0+000 (Vill. Tendesara) to design ch. 44+500 (Vill. Parsada) in the State 4of Chhattisgarh on EPC Mode under Bharatmala (Package A) |
Chhattisgarh | EPC |
| Construction of 6-Lane Durg – Raipur – Arang Bypass section of NH-53 from design ch. 44+500 (Vill. Parsada) to design ch.92+230 (Vill. Paragaon) in the State of Chhattisgarh on EPC Mode under Bharatmala (Package B) | Chhattisgarh | EPC |
| Construction of twin tube tunnels on Jammu Ring Road (NH-244A) between Design Ch.50+600 to 51+700 and Design Ch. 53+535 to 55+700 on EPC mode under Residual NHDP component of Bharatmala Pariyojna Phase – I. | J&K | EPC |
| Four laning of Bhaniyawala-Jollygrant-rishikesh spur section of NH-07 from km. 0.00 to km 20.600 in the state of Uttarakhand under NH(O) on Hybrid Annuity Mode | Uttarakhand | HAM |
| Construction of ROB at Km 146+488 of NH-76 including approaches on EPC basis in the state of Uttar Pradesh. | Uttar Pradesh | EPC |
| Construction of VUP, Services road at km 17.325 in village Behram on Phagwara – Runagar section of NH-344A in the state of Punjab on EPC Mode. | Punjab | EPC |
| Construction of 4-Lane highway with paved shoulders from Km 74.700 to Km 112.950 of NH-731A (i/c Yamuna Bridge) on HAM in the State of Uttar Pradesh. (Package IV) Only Highway Part |
Uttar Pradesh | HAM |
| Construction and Upgradation to Four Lane from Manikpur (Design.Ch. Km 0.000) to Sahebganj (Design.Ch. Km 44.800) section of NH139W under Bharatmala Pariyojana scheme on HAM Mode in the State of Bihar” Projects.Only Structure Part | Bihar | HAM |
| Construction of Four-Laning of NH-716 from Chinna Orampadu (Design Km 64.200/ Existing km 196.125 of NH- 716) to Renigunta on NH 565 near Tirupati Airport Road (Design Km 121.935 / Existing km 137.000) (Design Length = 57.735 Km) on HAM under Bharatmala Pariyojna in the state of Andhra Pradesh (Package-II) | Andher Pradesh | HAM |
| 4 -Laning of MP/UP Border to Kabarai section of NH-34&35 from km 197.000 to km 242.991 (Length= 45.991 Km) (Sagar- Kabrai Package-5) under Bharat Mala Pariyojana (EC) in MP & UP on Hybrid Annuity basis.” | Madhya Pradesh | HAM |
| Construction of ROB on NH-35 (NH-7) Varanasi-Mirzapur Section) in connection with the Rail connectivity of MultiModal Terminal of IWAI in the state of Uttar-Pradeshon EPC Mode. | Uttar Pradesh | EPC |
| Pre- Bid Engineering Consultancy Services for Highway and Structures for the following Projects 4 Laning of Basukinath to Deoghar Section of NH 114A from Design km 85.081 to Design Km 130.240 (Design Length 45.159 km) in the state of Jharkhand on Hybrid Annuity mode. Only Structure Part | Jharkhand | HAM |
| Up gradation of Existing SPR from Faridabad junction to its connection with Dwarka Expressway interchanges on NH-48 with 8 flyovers 6 lane divided carriageway with 3 lane service road along each side in Gurgaon Haryana Only Highway Part | Haryana | EPC |
| Rehabilitation and Upgradation to 4 Lane with paved shoulder configuration and Strengthening of Bijni to Mandi section from Km 202.815 to Km 208.000 of NH-20 (NH-154) (Design Length 5.357 KM) of Pathankot-Mandi under NH(O) in HP (Except Tunnel) | HP | HAM |
| Construction of RoB at Km 202.992 of NH-76 including approaches on EPC basis in the state of Uttar Pradesh. | Uttar Pradesh | EPC |
| Four laning of NH 530B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530B/Design Km. 66.000) to Kasganj Bypass (End) (Existing Km.150.100 of NH 530B/ Design Km. 123.100) in the State of Uttar Pradesh on Hybrid Annuity Mode.” |
Uttar Pradesh | HAM |
| Rehabilitation and upgradation of NH-340C in the state of Andhra Pradesh under NH(O) on Hybrid Annuity Mode. PKG-1.- from Kurnool (Existing Km. 5.400 of NH-40/Design Km 0.000) to Mandlem (Existing Km. 38.000 of NH- 340C/Design Km 30.600) to Four lane with paved shoulders (Design Length = 30.600 kms) PKG-2.- from Mandlem (Existing Km. 38.000 of NH- 340C/Design Km 30.600) Atmakur to (Existing Km. 73.000 of NH-340C/Design Km 66.115) to Four lane with paved shoulders (Design Length = 35.515 kms) |
Andher Pradesh | HAM |
| Six laning of Surat – Nashik – Ahmednagar – Solapur – MH/KNT Border Greenfield stretch [Package –XIV from km 512.000 (Hasapur) to km 548.400 (Badadal)] in the State of Maharashtra to be executed on Hybrid Annuity Mode under Bharatmala Pariyojana” | Maharashtra | HAM |
| Four Laning of Abohar (Design chainage 75.500, Existing Km. 49+070 of NH-07) to Fazilka (Design chainage 114.080, Existing Km. 80+655 of SH-20) and Construction of New 4-lanes Greenfield highway of Abohar bypass (From design chainage 0.000, Existing Km 58+230 on NH-07 to Design chainage km 6.380, Existing Km 42+305, Abohar – Fazilka Road on NH-07) (design length=44.96 km) on HAM Mode in the state of Punjab under Bharatmala Pariyojana | Punjab | HAM |
| Construction of Atal Progress way in green field Pkg: 6 from design Chainage Km: 265+000 to Km: 312+950 in the state of Madhya Pradesh on HAM Mode to Four lane configuration. | Madhya Pradesh | HAM |
| Construction of Raebareli Ring Road Phase-II with four lane configurations (Design Length 21.888 km) for Rae-Bareli City in the state of Uttar Pradesh on Hybrid Annuity Model (HAM) basis | Uttar Pradesh | HAM |
| Pre Bid Services for Four laning of NH 530B from Kasganj Bypass End (Existing Km. 150.100 of NH 530B/ Design Km. 123.100) to Chandan Nagar (Existing Km 96.200 of NH 530B/Design Km. 179.500) section of NH 530B in the State of Uttar Pradesh on HAM mode – Package 3 | Uttar Pradesh | HAM |
| Rehab and Upgrade of Exist.Road Dareota Vill. to Nauni Chowk of NH205 for2/4Lane Paved Shoulder ChainagKm33.175 to Km40.300 2Lane Design Length7.125Km including single tube tunnel and Km40.300 to Km58.450 4Lane Design Length18.150Km PkgIIB in HP on HAM. | HP | HAM |
| Construction of New 2Lane with Paved Shoulder from Shalaghat to Dareota Vill of NH-205 (Design Chainage km 27.500 to km 33.175 Design Length 5.675 km) including twin tube tunnel Pkg-IIA in Himachal Pradesh under NH(O) on HAM. | HP | HAM |
| Project 3- Design and Construction of Uni-Directional Two Lane Twin Tunnels at Shinkun La Pass of Length 4.1km (Approximate Length) including Civil and Electrical / Mechanical Work along with Approaches Connecting Darcha- Padam Highway to NHDL Specification in Himachal Pradesh and the U.T. of Ladakh | Ladakh | HAM |
| Improvement and Rehabilitation of Existing Ayodhya Bypass from Design km 121.600 to Design km 144.020 (Design Length 22.420 km) of NH28 (New NH27) on EPC Mode under Bharatmala Pariyojana in the State of Uttar Pradesh. | Uttar Pradesh | EPC |
| Development of 6lane GF Ring Road (Package III) starts from 51.200 to 68.650(Length 17.450kms) around Kanpur City and Construction of 4lane Airport link road(Length 1.45 km) at 62.090 of Kanpur ring road in UP on EPC mode | Uttar Pradesh | EPC |
| Construction of Road Over Bridge in lieu of LC No.28, having Composite steel girder span 1×31.28m over Track span and Composite steel girder span 2x6x25.08m over approaches with Reinforced Earth (RE) walls along with Limited Height Subway (Internal size 5.0×3.0m) and other allied works at Railway Km. 31/8-9 between Ahera halt and Bagpat road station on Delhi Shahdara-Shamli section of Delhi Division, Northern Railway. | Uttar Pradesh | EPC |
| Construction Of Balrampur bypass with two lane flexible pavement configuration from km 223.000 of NH-330 to km 328.300 of NH-730, design length of 20.515 km under EPC mode in the state of Uttar Pradesh. | Uttar Pradesh | EPC |
| Construction of New Line between New Modasa (MDSA) at take off point at Km :99.00 (from Nadiad) Chainage Ch.:0.00 m to Shamlaji Road (SJS) at Ch.:26595.40 m (26.595 km) covering all Civil Engineering works (i.e. Earthwork, Blanketing, Side Drains, Retaining Wall, Construction of Important Bridge, all Major / Minor Bridges, RUBs / LHS, Level Crossings, Complete Track works, Ballast Supply and Other Civil Engineering works) of Vadodara Division on Western Railway | Gujarat | EPC |
| Construction of LVUP Design Ch. 117.920, LVUP and other related work on Panipat -Jalandhar Section of old NH-1 (new NH 44) from km 96.000 to 387.100 in the state of Harayana on EPC mode. | Haryana | EPC |
| Pre Bid Services for “Construction of 4-lane Pathalgaon-Kunkuri CG-JH border section of NH-43 starting from end point of NH-130A as part of Raipur-Dhanbad EC under BMP (Lot-5-Pkg-7) in Chhattisgarh” (PKG-1&2). | Chhattishgarh | HAM |
| Construction of 6-lane flyover at Dewas Nakaintersectionin Indore city in the State of Madhya Pradesh Pradesh on EPC mode | MP | EPC |
| Construction of 6-lane flyover at Crystal IT Park Square intersection in Indore city in the State of Madhya Pradesh on EPC mode | MP | EPC |
| Construction of LVUP and VUP at Km 64/355, 81/400 & 103/320 on NH 58 (Beawar – Gomti Section ch. 58/245 to 108/600 in the state of Rajasthan on EPC Mode in Road safety Annual Plan 2022-23 | Rajasthan | EPC |
| Design and construction of crossing facility of VUP at 4 locations on Pune Satara Section of NH 4 from km 725.000 to 865 350 length km 140.350 in the State of Maharashtra on EPC mode | Maharashtra | EPC |
| Construction of 03 nos. of LVUPs at Km. 355+080 (Gourachandrapur), Km. 383+350 (Dadhimachha Gadia) and Km.398+680 (Gangapada) along with approaches on Tangi-Bhubaneswar section of NH-05 (New NH-16) (Km.355+000 to Km.414+000) in the State of Odisha | Odisha | EPC |
| Construction of Underpass at Km.131+530 and CUP at Km.131+700 at Charampa on Chandikhole – Bhadrak section of NH-05 (New NH-16)in the State of Odishaon Engineering Procurement and Construction (EPC)Mode | Odisha | EPC |
| Pre Tender Engineering Services II Construction of Basti Ring Road (Phase-I) with four lane configuration (Design length 22.150 Km) for Basti City in the state of Uttar Pradesh on Hybrid Annuity Mode II | Uttar Pradesh | HAM |
| Pre bid Services for CONSTRUCTION OF PUP AT BIRABHADRAPUR, CH-51+500 OF BHUBANESWAR -PURI SECTION OF NH-316 (OLD NH-203) FROM 0.000 TO 56.500 IN THE STATE OF ODISHA | Odisha | EPC |